The project consisted of two new 13,000
SF classroom wing additions. Construction
was steel frame, metal bar joists with
insulated metal decking and standing seam
roof panels to match the existing building.
The exterior metal stud walls with gyp
sheathing were finished out with a masonry
veneer. Interior finishes included carpeting,
plastic laminate wall panels in corridors,
red oak millwork with laminate countertops
in classrooms, acoustical ceilings, and
mechanical, electrical, and plumbing systems.