Bee Cave Elementary School Kitchen Renovation

Austin, Texas

Size:

2,200 SF

This elementary school project is a commercial kitchen renovation consisting of complete demolition of interior walls, structural steel modifications, new underslab plumbing, epoxy floors, HVAC, electrical, plumbing fixtures, fire alarm, fire sprinkler, lighting, ceilings, doors frames, and hardware. It is upgraded with new communications, data, visual menu displays for the serving lines, along with all new finishes including ceramic tiling on walls. The kitchen is comprised of new stainless appliances, shelves, and counter-tops throughout. It has a new walk-in refrigerator and walk-in freezer with additional dry storage and shelving. In addition, a new CMU wall layout wall built between the serving line and Cafeteria. This project also included repainting of the Cafeteria walls.

1/3

Owner:

Lake Travis Independent School District

Architect:

O’Connell Robertson Architects

Delivery Method:

Construction Manager at Risk

Attributor: 

Braun & Butler Construction, Inc.

AFFILIATIONS

AGC

CFMA

A4LE

CEDAR PARK OFFICE

715 Discovery Blvd., Ste, 109

Cedar Park, Texas 78613

WESTLAKE OFFICE

1715 S Capital of TX Hwy , Ste. 100

Austin, Texas 78746

Phone: (512) 837-2882

Fax: (512) 837-5115

FOLLOW US ON:

  • Facebook
  • LinkedIn Social Icon

© 2019 by Braun & Butler Construction, Inc.