Weekly Project Update
TCESD 2 STATION 6

Jeff Krueger
THIS WEEK'S ACCOMPLISHMENT
- Retaining Wall Concrete Placement
- Retaining Wall Wreck Forms
- Metal Stud Framing at AB
- Exterior Sheathing Material On-site
- Hollow Metal Door Frames Set at AB
-

Exterior Sheathing Underway
NEXT WEEK'S ACTIVITIES
- Exterior Sheathing Install
- Concrete Paving Grading
- Irrigation Sleeves
- Retaining Wall Backfill
- CMU Wall Install

-
AB Metal Stud Framing

Retaining Wall Ready to Backfill
LOOK AHEAD SCHEDULE
Click on document icon below to review the detailed Look Ahead Schedule.