Weekly Project Update

Marble Falls Region 13

Placeholder

Nathan Stanford

THIS WEEK'S ACCOMPLISHMENT

    Electrical wall rough in inspection passed
    Wall framing inspection passed
    Above ceiling duct and duct insulation passed
    Large steel I beams for partitions installed
    Blocking behind sheet rock completed.
    Color selections started Ordering future materials depends upon this completion.
Excavation 1.jpg

Large I beams for folding partitions installed

NEXT WEEK'S ACTIVITIES

    Sheet rock all walls Start sheet rock on hallway tunnels.
    Small units inside to hang off ceilings
    Layout for outside large units to complete so duct can order
    Framing above folding partitions start
    Owner low voltage wires overhead install
Excavation 1.jpg
    Flex duct installs.

All door frames save 2 are istalled

Excavation 1.jpg

Hallway tunnel framing completed and inspected.

LOOK AHEAD SCHEDULE

Click on document icon below to review the detailed Look Ahead Schedule.