Weekly Project Update
Marble Falls Region 13

Nathan Stanford
THIS WEEK'S ACCOMPLISHMENT
- Electrical wall rough in inspection passed
- Wall framing inspection passed
- Above ceiling duct and duct insulation passed
- Large steel I beams for partitions installed
- Blocking behind sheet rock completed.
- Color selections started Ordering future materials depends upon this completion.

Large I beams for folding partitions installed
NEXT WEEK'S ACTIVITIES
- Sheet rock all walls Start sheet rock on hallway tunnels.
- Small units inside to hang off ceilings
- Layout for outside large units to complete so duct can order
- Framing above folding partitions start
- Owner low voltage wires overhead install

- Flex duct installs.
All door frames save 2 are istalled

Hallway tunnel framing completed and inspected.