THIS WEEK'S ACCOMPLISHMENT

    Held Pre-con with LCRA, Owners, and Travis County
    CE excavating in STA: 10+66 area and took out storm drain
    Acquired infrastructure permit from WD #17
    Held Pre-con meeting with Kinney's Plumbing and Texas Roofing
    JR Schneider started excavation in detention pond, WQ #2, & Spillman Loop
    A lot of RCP, pipe casings, gravel, and excavation equipment were delivered this week
Excavation 1.jpg

One of the multiple stacks of RCP

NEXT WEEK'S ACTIVITIES

    Continue excavation on detention pond
    Removal of concrete curbs and dirt work on bus loop
    Continue installing storm drain line SS-A
    Complete wire pull in existing school
    Start roof and wall penetrations for plumbing in existing school
Excavation 1.jpg

CE excavating in road area STA: 10+66

Excavation 1.jpg

JR doing Detention Pond Excavation

LOOK AHEAD SCHEDULE

Click on document icon below to review the detailed Look Ahead Schedule.